BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Maui Sands Condos - ECPv4.8.0.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Maui Sands Condos
X-ORIGINAL-URL:https://legacy.mauisandscondos.com
X-WR-CALDESC:Events for Maui Sands Condos
BEGIN:VEVENT
DTSTART;TZID=Pacific/Honolulu:20170429T000000
DTEND;TZID=Pacific/Honolulu:20170429T000000
DTSTAMP:20260521T181108
CREATED:20170430T041028Z
LAST-MODIFIED:20170430T041335Z
UID:585-1493424000-1493424000@legacy.mauisandscondos.com
SUMMARY:Building 2 Week 1 Painting
DESCRIPTION:Building 2 Week 1: Upstairs Plastic Barrier Wall Up all week\, Lead Abatement\, Painting Entrance side of condos. \n\n4/24 Monday\n\n8:00 am – 12:30 pm Staging of Building 2 Upstairs: Workers install plastic barrier wall enclosing and protecting walkway side of the building. \n12:30 pm -3:30 pm Lead Abatement. Condos will NOT be accessible during this work due to lead dust. Plan on being out of the area during this time. \n\n4/25 Tuesday\n\n8:00 am – 3:30 pm Lead Abatement. Condos will NOT be accessible during this work due to lead dust. Plan on being out of the area during this time. \n\n4/26 Wednesday\n\n8:00 am – 3:30 pm Lead Abatement. Condos will NOT be accessible during this work due to lead dust. Plan on being out of the area during this time. \n\n4/27 Thursday\n\n8:00 am – 3:30 pm Plastic Barrier on 2nd floor taken down. Painting of trim and sides of buildings. Condos will be accessible with some interruption from painting. \n\n4/28 Friday\n\n8:00 am – 3:30 pm Painting of trim and sides of buildings. Condos will be accessible with some interruption from painting. \n\n4/29 Saturday – No Work\n4/30 Sunday – No Work\n\n
URL:https://legacy.mauisandscondos.com/event/building-2-painting/
CATEGORIES:Owners,Public
END:VEVENT
END:VCALENDAR